Quantcast
Viewing all articles
Browse latest Browse all 3636

cr2008 – Huge delay sending to the printer spooler.

Hi,

Happy New Year

 

 

System requirements:

 

Windows 8 Enterprise (System type: 64-bit - Operating System, x64-based processor)

 

Development application tool: Microsoft Visual Studio 2008

 

Crystal Reports XI (Product version: 11.0.0.2495)

 

Crystal Reports 2008:

       CR Developer is 12.6.2.1782.

       Distributed runtimes: CRRuntime_12_6_mlb.msi

 

 

Three impressionswith2356pagesprinting were performed

(Print option: Start printing after last page is spooled)

Time andfile sizewere obtainedwhen sending toprinter spooler:

With crXI
– 60 secondsand8.16 MB

cr2008(
PrintOutputController ( RAS ))
– 164 seconds and 178MB

cr2008(withP2P)

– 3734 seconds and 450 MB


The differences intime and file sizesentare unbelievable!

 

 

How canresolve thesediscrepancies?

 

A patch for this situation is absolutely necessary!

 

Perfeito Aguiar


Viewing all articles
Browse latest Browse all 3636

Trending Articles